Aeterna Group site engineer with drawings in front of a city construction skyline
AGCS

Finishing & ServicesElectrical Installation

Load-calculated, earthed and labelled.

TurnkeyFoundation to finishing
DocumentedSafety & progress
PAN IndiaProject delivery

Overview

Electrical Installation

Internal electrical installation from the distribution board outward — circuits sized to calculated load, proper earthing, labelled boards and a circuit schedule that means something to the next electrician.

What this covers

  • Circuits sized from a calculated load, not a rule of thumb
  • Earthing and RCD protection installed and tested
  • Distribution boards labelled with a real circuit schedule
  • Conduit routes recorded so nobody drills through a cable

Next step

Need Electrical Installation?

Share the requirement and we will respond with a scoped, honest proposal — usually within one working day.

Most enquiries answered within one working day.

What happens next

  1. 1 You tell us the requirementA call, an email or a WhatsApp message. A rough idea is enough to start.
  2. 2 We survey and scope itA site visit or a requirements call, then a written scope you can hold us to.
  3. 3 You get a costed proposalLine-by-line pricing and a timeline — with an honest note if we are not the fit.